Finishing the apartment is one of the necessary and necessary things in order to be able to settle down and live in it in a way that is comfortable and away from any problems that may occur in the apartment, and from here it was necessary to pay attention to knowing the series of integrated finishing steps and all the stages that this process goes through and its arrangement, so that It will be easy for you to follow the works that are being carried out in your apartment and you are well aware of this and you can either discuss the supervising engineer or the workers and express your opinion. Also, finishing the apartment is one of the things that undoubtedly increases its price when selling, which makes your real estate investment successful, whether you are thinking of renting or selling in the future. Arranging the stages of finishing the apartment
We are continuing our article, which deals with the topic “Your Complete Guide to Finishing Your Apartment”, by touching on a basic and very important point, which is “arranging the stages of finishing the apartment”. In order to ensure that your apartment is received in the best possible way, and in order to be satisfied with the quality of the finishing work and its final form, the sequence and sequence of the integrated finishing steps must be respected, which are carried out according to the following order:
Explanation of the various stages and finishing works of the apartment We continue to explain the topic of “Your Complete Guide to Finishing Your Apartment” with a simplified explanation of the various stages and works of apartment finishing that we mentioned in the previous item.
First: electrical work
This stage is the first stage in the integrated finishing steps, and is concerned with the installation of various electrical circuit breakers in what is known as electrical boxes. It is also possible to install the telephone wire at this stage. Once the first painting is completed, comes the step of installing the faucet covers, as well as installing the plugs and so on. The electrical switches, then the plumber performs a set of some work, then installs the lighting and starts operating it experimentally. During this stage, the final sanitary works, and of course the lighting units, are fully completed, and the Najaf is installed. After the completion of these electrical works, it is possible to submit a request for electricity connection to the apartment, and here the electrical wires are connected to the inside of the bathroom, bathrooms, and on the roofs, and in the end come the switches and also the main block.
As for the completion of the electrical work, digging of paths in the walls and ceilings is started, and the location of the switchboard is also determined according to the engineering drawing drawn up by the engineer supervising this stage, in addition to determining the location of the meter, which is often outside the apartment, as well as setting the switches Electricity for each room separately, identifying the various electricity points that need to be fed, and the locations of the frames according to each room of the apartment, and ensuring that they are working properly. Where the boxes must be at an appropriate level, not submerged into the wall and not protruding too much, and the various connections such as the TV connection, and the shower should also be added without neglecting the connections of the air conditioners as well. All of which should be fixed with gravel and mortar, taking into account the quality of the raw materials used. Then comes the installation of the magic boxes on the ceilings and walls, and the tamping of wires into the hoses to be prepared to operate the electrical appliances in the house…
Second, the plumbing work
Plumbing work is the second stage of the finishing work. After the electrician connects the electrical wires, and a request is made to extend the apartment with gas in coordination with the gas company, the plumber’s work begins to extend the necessary connections. It focuses on its appropriate and elegant implementation, and takes into account the coordination of the installation places of devices such as the heater, washing machine and other natural gas-powered devices so that the gas line is planned without the slightest errors.
Basically, in this stage, the network of sewage pipes, and the drains on the floors, as well as the base of the toilet, in addition to the bathroom showers, faucets and manhole covers, are being extended. Before receiving any of these parts, they must be tested first. And as a necessary step in plumbing works, connect the air conditioners’ drainage network, install sinks, bathtubs and mixers in the bathroom, kitchen, and work on toilet drain outlets.
With regard to receiving the plumbing, here the extensions are made inside the toilets, the location of the washing machine drains, the location of the sewage system, and also the location of the sink in the kitchen are specified. Any water leaks in the apartment as a whole, including the walls and floors, are also detected, and then the supply line is connected to both the roof and the bathroom after cleaning the cracking residues. Among the points that must be paid attention to is the installation of a service pine for necessity, and determining the drainage, plumbing and insulation of the bathroom.
Third: carpentry work
This stage is concerned with the implementation and installation of the various carpentry of the apartment from doors and windows in rooms and balconies as well, and the installation of doors, if they are of aluminum, is postponed until the level of the height of the ceramics is determined. The main door of the apartment, wooden door frames and windows, etc. are installed, and then it is taken into account to leave a distance of between 10 to 15 cm between the ground level and the structures, and the screed and throats are installed until the installation of other carpentry.
Fourth: the work of the oyster
Before starting the work of oysters, all necessary raw materials such as sand, cement and gypsum must be provided and stored well so as not to be damaged, especially if the apartment is on one of the high floors. You must check that you get the best types of cement and mortar and that you have the necessary water and mix it. As for wood, you can use musky wood, oak or Azazy wood to make wooden rings. The two koalas are also installed in the main apartment door.
Fifthly: gypsum work
After completing the clam works, the gypsum work is started, which depends on the solidity and quality of the materials used and the skill of workmanship, so the clamshells of the ceilings and cornices are made, taking into account that they are left for at least 7 days before starting other work.
Gypsum work helps to increase the solidity and cohesion of walls and ceilings and contributes to the aesthetics of the entire apartment and is preferred by many apartment and real estate owners now, and has become in great demand.
Sixth: insulation works
The stage of insulation works is one of the most important stages of finishing, as it protects the apartment from water and moisture leaks. After receiving the insulation, a packing test is carried out, to note any trace of water, on the ceilings of the basement floors. And in the event that any trace appears, a light protection layer of the insulator is placed. I hope that if the leakage is large, the insulation work will be repeated again, which is using several materials, including bitumen coils.
Seventh: Flooring and tile works
At the stage of flooring and tile work from your complete guide to finishing your apartment, it is necessary to provide materials such as sand, black and white cement and all floor finishing materials, and it must be verified that the ministries are level on all walls of the apartment, so that the process of draining water in the drains is easy and smooth Verification of the balance of the earth and its accuracy should not be neglected. Taking into account leaving the overalls with a width of 8 cm and when needed the presence of the required inclination.
During this stage, the rooms and corridors are paved and the bathrooms are plastered… using different materials that are all available such as ceramics, marble, porcelain and parquet as well.
Eighth: Bishop and gypsum works
This stage is not mandatory, as it depends on the taste of the apartment owner and his inclination to implement designs that include ceilings borrowed from gypsum and decorations made of gypsum board used in the work of cornices.
With the installation of the nets and the house of light, the stage of plastering also begins, where sanding of the surfaces must be taken into account perfectly and attention to the quality of the welds, as well as making openings for lighting upon completion.
Ninth: Gas works
Gas works is the step that precedes the last stage of your complete guide to finishing your apartment. After coordination with the gas company, the oakers, kollans and door handles are installed, which must be of high quality so as not to be damaged with use, and the windows and balcony doors are moistened.
After planning the gas line, which should be from the outside to the inside, the connections are installed so that they appear neat and unobtrusive to the eye and take into account the coordination of the layout of gas-powered devices.
Tenth: Painting and engraving works
We come here to the last stage in your complete guide to finishing your apartment, which is painting and engraver work. This stage is a very delicate and aesthetic task, as it is necessary to focus on the final quality and paint the solution of the electrical boxes, and above the electrical hoses as well. Attention should be paid to the cleanliness of the site and the grease in the corners as well.
Painting is carried out according to several stages, starting with preparing the walls for painting, giving them 2 putty knives, and then applying two sides of the final layer, but sanding must be done before it. And then the discussion goes back to the work of the third putty knife, where before that he was interested in coating two faces with “Sealer” insulator.
Have a Question
Latest company news, interior design and construction articles.
Need help from IBS Engineers?
We will be happy to help you anytime!